FRAI Global

Scheduling & Planning

Freight scheduling and planning on one operational screen

FRAI gives planners one screen for scheduling and planning: jobs, assets, drivers and routes against real operational capacity, all tied to one shipment, one live reference and working with your existing systems.

40%
Less planning time
98%
Fewer manual errors
One
Scheduling screen
DashboardSchedulingProjects
Search…
OT

Projects

01/06 – 30/06/2026
Filters
Need driver44Need truck47Need trailerNeed modular setup6Need routeFully planned
Projects
June 2026
14710141720232630
Projects needing action
426557Turbine Components MovePlan
Northwind Industries26 Apr – 02 Jun
Needs driverNeeds medical setup
426557
418891Power Transformer RelocationPlan
Acme Holdings26 Apr – 30 Jun
Needs medical setup
418891
426559Self-Offload: ModularPlan
Vertex Group13 Mar – 17 Jun
Needs truck
426559
420185Bridge Beam DeliveryPlan
Summit Partners13 Jun – 21 Jun
Needs route
420185
426437Port Heavy LiftPlan
Meridian Co24 May – 04 Jun
Needs medical setup
426437
Quick answer

FRAI puts freight scheduling and planning on one operational screen, planning jobs, drivers, trucks and trailers against real capacity with every job tied to one live reference. Clashes and unmet requirements surface as you plan, and operators using it have seen 40% less planning time and 98% fewer manual errors, working with your existing systems.

The problem

Why is scheduling spread across spreadsheets?

Planners juggle jobs, assets and people across spreadsheets, whiteboards and separate systems. Without a single view of capacity, double-bookings and gaps are easy to miss until they become problems.

No single capacity view

Jobs, drivers, trucks and trailers are planned in different places, so real available capacity is never visible at a glance.

Manual errors and clashes

Re-keying between tools causes double-bookings, missed dependencies and last-minute scrambles to recover a plan.

Planning eats the day

Hours go into assembling and re-assembling the plan instead of resolving the exceptions that actually matter.

How FRAI fixes it

How FRAI brings planning together

FRAI consolidates scheduling and planning onto one screen, with every job tied to one live reference. It pulls from your existing systems so capacity, assets and dependencies stay accurate without manual re-keying.

  • See jobs, drivers, trucks and trailers against real operational capacity in one view.
  • Surface clashes and unmet requirements before they become day-of problems.
  • Plan around dependencies (assets, permits and documents) on the same reference.
  • Sync with your existing systems so the plan reflects reality, not a stale copy.
DashboardJobsPlanning board
OT
Need driver · 3Need truck · 2Route planning · 1
Today's jobs· live board
J-8821Port delivery · 426557Active
AssignedNeeds truck
J-8819Yard transferActive
J. SmithTRK-104
J-8815Abnormal load escortActive
UnassignedTRK-208

Workflow before and after

What changes day to day

Before FRAI

  • Plan spread across spreadsheets, whiteboards and separate systems
  • Capacity and clashes only spotted late, often by accident
  • Hours spent rebuilding the plan after every change
  • Asset and permit dependencies tracked manually on the side

With FRAI

  • One operational screen for jobs, assets and people
  • Clashes and unmet requirements flagged as you plan
  • Changes update the live reference instead of a rebuild
  • Asset, permit and document dependencies in the same view

Case study proof

Operator cut planning time 40% with one scheduling screen

A heavy haulage operator consolidated scheduling, routes, permits and assets into a single operational view, cutting planning time and manual errors.

  • 40% less planning time
  • 98% fewer manual errors
  • One scheduling screen
Read the case study

FAQ

Frequently asked questions

Common questions about scheduling & planning with FRAI.

What makes FRAI scheduling different?

FRAI plans jobs, assets and people against real operational capacity on one screen, with every job tied to one live reference. It works with your existing systems rather than replacing them, so the plan always reflects reality.

Does scheduling connect to assets and permits?

Yes. Scheduling and planning shares a live reference with asset and trailer tracking and heavy haulage routing and permits, so dependencies are visible in the same view.

Will it replace our current systems?

No. FRAI works with your existing systems and automates the planning work around them. There is no rip and replace.

See how FRAI fits into your freight operation

Book a personalised demo and explore how FRAI can automate your workflows across your existing systems, with no rip and replace.